Apartment S4 with a total usable area of 50.42 m² is for sale, located on the 2nd floor of a modern building under construction in Vodice. The living area is 44.14 m², and the apartment also has a terrace of 9.41 m² and an outdoor paved parking space of 12.50 m². The building will have business space on the ground floor and a total of six residential units spread over two floors. Schedule The apartment consists of an entrance, bathroom, one bedroom, kitchen with dining area and living room with access to a terrace that provides a pleasant space for staying and relaxing. Equipment and construction quality The project was designed with an emphasis on functionality, energy efficiency and a modern living style. High-quality materials and equipment are used in the construction and furnishing: • thermal facade for high energy efficiency • ALU three-layer sliding balcony doors and windows • modern-looking glass balcony railings • Sika and Mapei insulation systems • burglar-proof and fire-resistant entrance doors • large format ceramics • underfloor heating in bathrooms • WiFi inverter air conditioners (GREE or Midea) in the bedroom and living room • electric blinds and mosquito nets on the windows • video intercom • own electricity and water meters • TV connections in the living room and bedroom • preparation for a solid fuel stove • electric water heater • top quality sanitary ware: Grohe / Hansgrohe / Voxort Depending on the construction phase, customers are given the option to choose the ceramics and colors of the sanitary ware according to their own wishes. Location Vodice is one of the most sought-after Dalmatian tourist and residential destinations, known for its well-maintained beaches, crystal clear sea, rich gastronomic offer and lively, yet pleasant Mediterranean atmosphere throughout the year. The property is located in a quiet and attractive area of Vodice, 900 m from Vrulje beach and 1,100 m from the city center. Each apartment has a paved parking space, with the option of purchasing an additional parking space. The planned completion of the works is scheduled for the summer of 2027. Note: Renders were used in the ad. For additional information, please contact us.